Project

General

Profile

Feature #10879

Progressbar message when exporting should tell the current status

Added by Jean-Luc Coulon over 3 years ago. Updated over 3 years ago.

Status:
Triaged
Priority:
Low
Assignee:
-
Category:
General
Target version:
-
Start date:
01/17/2016
Due date:
% Done:

20%

Affected Version:
git development version
System:
Debian
bitness:
64-bit
hardware architecture:
amd64/x86

Description

Hi,
When I export files, I've a progression bar and message at the lower left of the screen.

The message itself only indicates the total number of pictures to be exported whithout mentionning the remaining or the already transferred pictures.

The message is (probably) this one:
#: ../src/control/jobs/control_jobs.c:1189
#, c-format
msgid "exporting %d image to %s"
msgid_plural "exporting %d images to %s"

Can ou please add the already transfered picture with something like:
msgid "exporting %d image to %s, %d done"
or
msgid "%d/%d images exported to %s
or whatever you want.

The information appears on the screen while at the end of the conversion of a picture but the message doesnt stay long.

Regards

Jean-Luc

History

#1 Updated by Tobias Ellinghaus over 3 years ago

  • % Done changed from 0 to 20
  • Status changed from New to Triaged
  • Category changed from Lighttable to General
  • Subject changed from Please, modify the progression message while exporting files to Progressbar message when exporting should tell the current status

Also available in: Atom PDF